Zuku Fiber-To-The-Home Project including fiber cable running, termination, FAT mounting, splicing, link testing, TV Modem installation, Router installation, Repair & Maintenance works, etc.
Author: admin
TTCL Project
Construction of Greenfield cell sites across Tanzania including foundation civil works, equipment plinths, fencing, tower rigging, painting and accessories installation etc.
IT & Security Solutions
Breeztek was also responsible for comprehensive IT/Telecom support works for the Tanzanian Radar Project. Scope included refurbishment works at Air Traffic Control Centers (ATC) across 6 Airports in Tanzania including:
Lemgur 33kV/220kV/400kV Substation, Arusha (On-going)
►Construction of a 800sqm Control Building including the civil, mechanical, HVAC & Electrical works.
►Construction of Switchgear building
►Construction of nearly 1km of heavy cable trenches complete with trench covers in precast and galvanized checkered plates.
►Construction of over 400 gantry, Reactors and transformer foundations.
►Construction of Generator building....
Tanzania Radar Project
Full Turnkey Integrated Project including Survey, Design, Civil Structural Construction for 15-m high concrete tower, Control Building & Guardhouse, Access road constructions, Fencing, Steel & mechanical works, HVAC system, Fiber Optic cabling linking the Air Traffic Control, Structured cabling system....
JNIA Terminal III Distributed Antenna System
Installation of the complete Distributed Antenna System for Julius Nyerere International Airport brand new Terminal III. Scope included – TSS, Design, installation of power system, hybrid cables and fiber link, RUs, Antennas, including the central hubs & expansion hubs; System Commissioning, As-built documentation & integration support for all operators....
Tigo Project
Installation and Commissioning of 3G Equipment including complementary equipment across Dar es Salaam, Morogoro etc. and reports....
HTT Projects
IBS Project
Survey and Design of In-Building Solution for 10 buildings across Tanzania and Zanzibar.
HTT Tower Foundation Strengthening Project
Foundation reinforcement works to improve the capacity of collocation towers to bear load and protect entire facility. Scope included anchor fabrication, concrete works and as-built documentation....